HB47V is highly reliable and durable with seven technical highlights. More advanced boom structure technology ,More efficient rock valve pumping technology, Steadier stabilizer structure technology, Steadier reversing buffering technology, more reliable fully-hydraulic reversing technology, Ultra-low pressure loss hydraulic system technology, safer and smarter electrical control system.
Highly Reliable
· · International authoritative-certificate lighthouse factory & world-class manufacturing capability
· · Optimized key parts with ultra-high strength steel
· · Open hydraulic system & high configuration
· · Stable signal & precise control
Strong Pumping
· · A 10% increase in pumping efficiency
· · smoother flow, less blockage and meet long-time pumping need
· · Dual-purpose machine: quickly transform into a line pump
· · Various boom types & flexible working posture
· · Less site limitation, smaller footprint & wider placement range
Extremely Economical
· · Advanced fuel combustion & intelligent power matching technology
· · The best cost performance choice
· · Easy maintenance, cost-saving and time-saving
· · The industry-leading longest service life of wear parts
Ultimate User Experience
· · High configuration cab & exceptionally comfortable driving experience
· · Single-button operation design & optimized flow of the entire process
· · MachineLink+ & all in your control
· · 24/7 rapid troubleshooting & spare parts supply guaranteed
Description
|
Unit
|
Parameter value
|
Outline dimension
|
mm
|
13120×2500×3990
|
Overall weight
|
kg
|
34000
|
Chassis
|
Model
|
|
ZZ5347V484MD1
|
Max. speed
|
km/h
|
90
|
Max. grade-ability
|
%
|
40
|
Wheelbase
|
mm
|
4800+1400
|
Tire
|
|
315/80R22.5
|
Engine
|
Model
|
|
MC11.40-40
|
Max. power
|
kW
|
297
|
Max. torque
|
N·m/(r/min)
|
1900/1000~1400
|
Displacement
|
L
|
10.518
|
Emission standard
|
|
Eruo IV
|
Pumping system
|
Theoretical output
|
m³/h
|
170
|
Concrete pumping pressure
|
MPa
|
8
|
Theoretical pumping times
|
Time/min
|
23~26
|
Delivery cylinder diameter ×stroke
|
mm
|
φ260×2000
|
Max. diameter of pumping concrete
|
mm
|
≤40
|
Filling height
|
mm
|
1580
|
Concrete slump range
|
cm
|
8~23
|
Placing boom
|
Reach height
|
m
|
51.5
|
Reach depth
|
m
|
36.1
|
Slewingradius
|
m
|
46
|
Slewing angle
|
°
|
±270
|
Unfolding angle of the 1st section
|
°
|
90
|
Unfolding angle of the 2nd section
|
°
|
180
|
Unfolding angle of the 3rd section
|
°
|
180
|
Unfolding angle of the 4th section
|
°
|
240
|
Unfolding angle of the 5th section
|
°
|
210
|
Unfolding angle of the 6th section
|
°
|
120
|
Stabilizer span
|
Longitudinal span of stabilizer
|
mm
|
9540
|
Transverse span of front stabilizer
|
mm
|
9150
|
Transverse span of rear stabilizer
|
mm
|
10060
|
Others
|
Lubrication method
|
|
Automatic lubrication
|
Control method
|
|
Manual/remote control
|
Volume of water box
|
L
|
1200
|










